Arikah Map

East West MRT Line

East West MRT Line:Tiong Bahru (MRT) station on the East-West Line
Enlarge
Tiong Bahru (MRT) station on the East-West Line
East West MRT Line:The East-West Line is coloured green on system maps. This map includes the Changi Airport Branch, but excludes the under-construction Boon Lay extension continuing from the western end of the East-West Line
Enlarge
The East-West Line is coloured green on system maps. This map includes the Changi Airport Branch, but excludes the under-construction Boon Lay extension continuing from the western end of the East-West Line

The East West MRT Line was the second Mass Rapid Transit line in Singapore to be built. The line is currently 45.4 km long with 29 stations, and operated by SMRT Corporation. 1 complete loop of this line needs around an hour. This line is coloured green on MRT system maps.

As the name implies, the line connects central Singapore to both western and eastern parts of the island, with an additional branch to Changi Airport from Tanah Merah. Cross-platform transfer to the North South Line is provided at Jurong East, City Hall and Raffles Place stations while transfer to the North East Line at Outram Park station is possible via a linkway.



Contents

Stations

Station NumberStation NameInterchange
EW1Pasir Ris 
EW2Tampines 
EW3Simei 
EW4Tanah MerahInterchange with Changi Airport Extension
EW5Bedok 
EW6Kembangan 
EW7Eunos 
EW8/CC9Paya LebarInterchange with Circle Line
EW9Aljunied 
EW10Kallang 
EW11Lavender 
EW12Bugis 
EW13/NS25City HallInterchange with North South Line, cross-platform transfer available between Marina Bay-bound and Pasir-Ris bound trains, and between Jurong East-bound and Boon-Lay bound trains
EW14/NS26Raffles PlaceInterchange with North South Line, cross-platform transfer available between Marina Bay-bound and Boon-Lay bound trains, and between Jurong East-bound and Pasir-Ris bound trains
EW15Tanjong Pagar 
EW16/NE3Outram ParkInterchange with North East Line
EW17Tiong Bahru 
EW18Redhill 
EW19Queenstown 
EW20Commonwealth 
EW21/CC22Buona VistaInterchange with Circle Line
EW22Dover 
EW23Clementi 
EW24/NS1Jurong EastInterchange with North South Line
EW25Chinese Garden 
EW26Lakeside 
EW27Boon Lay 
EW28Pioneer (2009) 
EW29Joo Koon (2009) 

Changi Airport Extension

Station NumberStation NameInterchange
EW4Tanah MerahInterchange with city-bound and Pasir Ris-bound trains
CG1Expo 
CG2Changi Airport 

Note: this branch is currently served by a shuttle service (Tanah Merah - Changi Airport); through service from Boon Lay has been suspended since 2004.

Trains

East West MRT Line:Cabin of a train on the East West MRT Line
Enlarge
Cabin of a train on the East West MRT Line

Three batches of rolling stock are in service on the line, i.e. the Kawasaki Heavy Industries C151 Cars, the Siemens C651 Cars and the Kawasaki Heavy Industries & Nippon Sharyo C751B Cars. These trains operate from the two depots along the East West Line, the Ulu Pandan Depot near Jurong East and the Changi Depot off Tanah Merah.

History

Initial system

2nd phase of development

Future extensions

Boon Lay Extension (BLE)

After months of planning, the Land Transport Authority announced on December 29, 2004, the details of the Boon Lay Extension (BLE). The 3.8 kilometre, 2 station line will extend from Boon Lay Station on the western end of the East West Line, with one station along Jurong West Street 63 between Jurong Street 61 and Pioneer Road North, and the second station at Joo Koon Circle, near the junction of Benoi Road and International Road.

The fully elevated line will cost about S$436 million. Construction commence in the second half of 2005 and is targeted for completion by 2009. The extension's alignment along Jurong West Street 63, Upper Jurong Road, and International Road required the acquisition of one full lot and eight part lots, totalling about 28,000 square metres of land.

Categories


Mass Rapid Transit (Singapore) lines

Find

Find

Find